Previous revision
plan [2021/03/17 15:51] – [Project Plan] team2plan [2021/05/26 16:04] (current) – [Project Plan] team2
Line 66: Line 66:
 <WRAP box 400px center> <WRAP box 400px center>
 ^ PBI       ^ Title          ^ Status     ^ ^ PBI       ^ Title          ^ Status     ^
-        | Teambuilding report    | Done      |    +TR         | Teambuilding report    | Done      |    
-        | Topic choice     Done         +TC         | Topic choice   | Done         
-        | State of art and project backlog   | In progress        +SA         | State of art and project backlog   | In progress        
-        | Blackbox  | To do      |    +BB         | Blackbox  | To do      |    
-B         | System schematic and structural drawings + cardboard model   | To do      |    +SSS        | System schematic and structural drawings + cardboard model   | To do      |    
-        | List of materials    | To do      |    +LM         | List of materials    | To do      |    
-        | Interim report and presentation   | To do      |  +IR         | Interim report and presentation   | To do      |  
-C         | List of materials (revised): local providers & price, including VAT & transportation | To do      |  +LLR        | List of materials (revised): local providers & price, including VAT & transportation | To do      |  
-C         |Refined design of the product  | To do      |  +RDP        | Refined design of the product  | To do      |  
-C         |Revised interim report  | To do      | +RIR        | Revised interim report  | To do      | 
-        |Finalize design  | To do      | +SD         | Start Design  | To do      | 
-        |Finalize design  | To do      | +FD         | Finalize design  | To do      | 
-        |Finalize design: high fidelity prototype  | To do      | +FD         | Finalize design: high fidelity prototype  | To do      | 
-        |Upload result of functional tests  | To do      | +FT         | Upload result of functional tests  | To do      | 
-        |Upload final report + presentation + video + paper + poster  | To do      | +FR         | Upload final report + presentation + video + paper + poster  | To do      | 
-        |Final presentation  | To do      |+FP         | Final presentation  | To do      |
 </WRAP> </WRAP>
 </table> </table>
Line 92: Line 92:
 <WRAP box 400px center> <WRAP box 400px center>
 ^ Sprint    ^ Task  ^  Duration (d) ^  Responsible ^ Involved   ^ ^ Sprint    ^ Task  ^  Duration (d) ^  Responsible ^ Involved   ^
-| 1             |             | X and Y      XYZ|   +| 1         TR     |             | A            CV,K ,A |   
-| 2             |             | Z            | XYZ|     +| 2         TC     |             | Z            | CV,K ,A |     
-| 3             |             | W, Y and Z   XYZ+| 3         SA     |             | K            CV,K ,A 
-| 4             |             |            XYZ+| 4         BB     |             |            CV,K ,A 
-| 5         B                 | Z and W      XYZ|   +| 5         SSS                | F            CV,K ,A |   
-| 6             |             | and      XYZ+| 6         LM     |             | C            | C, V, F ,K ,A | 
-        | C                 | and      XYZ|+| 7         | IR     | 7             | V            | C, V, F ,K ,A | 
 +| 8         | LLR    | 7             | F and      CV,K ,A 
 +        | RDP    | 7             | V and A      | C, V, F ,K ,A | 
 +| 10        | RIR    | 7             | C            | C, V, F ,K ,A | 
 +| 11        | SD     |             | K            | C, V, F ,K ,A | 
 +| 12        | FD     | 7             | V and      CV,K ,A | 
 +| 13        | FD     | 7             | C and A      | C, V, F ,K ,A | 
 +| 14        | FT     | 7             | F            | C, V, F ,K ,A | 
 +| 15        | FR     | 7             | K            | C, V, F ,K ,A | 
 +| 16        | FP     | 7             | F            | C, V, F ,K ,A |
 </WRAP> </WRAP>
 </table> </table>
Line 109: Line 118:
 <WRAP box 400px center> <WRAP box 400px center>
 ^ Sprint    ^ PBI   ^ Responsible  ^ Involved   ^ Status      ^ ^ Sprint    ^ PBI   ^ Responsible  ^ Involved   ^ Status      ^
-| 1             | X and Y      XYZ| Done        |  +| 1         TR     | A            CV,K ,A   Done               |  
-| 2             | Z            | XYZ| Done        |      +| 2         TC     | Z            | CV,K ,A   Done               |      
-| 3             | W, Y and Z   XYZDone        |  +| 3         SA     | K            CV,K ,A   In Progress        |  
-| 4             |            XYZDone        |  +| 4         BB     |            CV,K ,A   To-Do              |  
-| 5         B     Z and W      XYZIn progress |   +| 5         SSS    F            CV,K ,A   To-Do              |   
-| 6             | and      XYZIn progress +| 6         LM     | C            | C, V, F ,K ,A |   To-Do              | 
-        | C     and      XYZIn progress |+| 7         | IR     | V            | C, V, F ,K ,A |   To-Do              | 
 +| 8         | LLR    | F and      CV,K ,A   To-Do              
 +        | RDP    | V and A      | C, V, F ,K ,A |   To-Do              | 
 +| 10        | RIR    | C            | C, V, F ,K ,A |   To-Do              | 
 +| 11        | SD     | K            | C, V, F ,K ,A |   To-Do              | 
 +| 12        | FD     | V and      CV,K ,A   To-Do              | 
 +| 13        | FD     | C and A      | C, V, F ,K ,A |   To-Do              | 
 +| 14        | FT     | F            | C, V, F ,K ,A |   To-Do              | 
 +| 15        | FR     | K            | C, V, F ,K ,A |   To-Do              | 
 +| 16        | FP     | F            | C, V, F ,K ,A |   To-Do              |
 </WRAP> </WRAP>
 </table> </table>
Line 123: Line 141:
 <WRAP centeralign> <WRAP centeralign>
 <figure flabel1> <figure flabel1>
-{{:gantt_chart.gif|}}+{{ :gantt.png?nolink&800 |}}
 <caption>Release Gantt chart</caption> <caption>Release Gantt chart</caption>
 </figure> </figure>