EPS@ISEP | The European Project Semester (EPS) at ISEP

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
plan [2021/03/17 14:28] – [Project Plan] team2plan [2021/05/26 16:04] (current) – [Project Plan] team2
Line 34: Line 34:
 <WRAP box 400px center> <WRAP box 400px center>
 ^ Sprint    ^ Start          ^ Finish     ^ ^ Sprint    ^ Start          ^ Finish     ^
-| 1         | 01/03/2021     14/03/2021      +| 1         | 01/03/2021     07/03/2021      
-| 2         15/03/2021     28/03/2021        +| 2         08/03/2021     14/03/2021        
-| 3         | 29/03/2021     | 11/04/2021   | +| 3         | 15/03/2021     | 21/04/2021   | 
-        | 12/04/2021     | 25/04/2021   | +| 4         | 22/03/2021     | 28/03/2021   | 
-        | 26/04/2021     09/05/2021     +| 5         | 29/03/2021     | 11/04/2021     
-        | 10/05/2021     | 23/05/2021   | +        | 12/04/2021     | 18/04/2021   | 
-7         | 24/05/2021     | 06/06/2021   | +| 7         | 19/04/2021     | 25/04/2021   | 
-8         | 07/06/2021     | 25/06/2021   |+        | 26/04/2021     02/05/2021   | 
 +        | 03/05/2021     | 09/05/2021   | 
 +| 10        | 10/05/2021     | 16/05/2021   | 
 +| 11        | 17/05/2021     | 23/05/2021   | 
 +12        | 24/05/2021     | 30/05/2021   | 
 +| 13        | 31/05/2021     | 06/06/2021   | 
 +14        | 07/06/2021     | 13/06/2021   | 
 +| 15        | 14/06/2021     | 20/06/2021   | 
 +| 16        | 21/06/2021     | 25/06/2021   | 
 + 
 + 
  
  
Line 55: Line 66:
 <WRAP box 400px center> <WRAP box 400px center>
 ^ PBI       ^ Title          ^ Status     ^ ^ PBI       ^ Title          ^ Status     ^
-        | Teambuilding/ introduction to our topic    done         +TR         | Teambuilding report    Done         
-        | State of art + final product proposal + blackbox   | In progress           +TC         | Topic choice   | Done         
-        | Sample task    | To do      |    +| SA         | State of art and project backlog   | In progress        
-A         Sample task    | To do      |    +BB         | Blackbox  | To do      |    
-        | Sample task    | To do      |    +SSS        System schematic and structural drawings + cardboard model   | To do      |    
-        | Sample task    | To do      |    +LM         | List of materials    | To do      |    
-        | Sample task    | To do      |   +IR         | Interim report and presentation   | To do      |  
 +| LLR        | List of materials (revised): local providers & price, including VAT & transportation | To do      |  
 +| RDP        | Refined design of the product  | To do      |  
 +| RIR        | Revised interim report  | To do      | 
 +SD         | Start Design  | To do      | 
 +| FD         | Finalize design  | To do      | 
 +| FD         | Finalize design: high fidelity prototype  | To do      | 
 +| FT         | Upload result of functional tests  | To do      | 
 +| FR         | Upload final report + presentation + video + paper + poster  | To do      | 
 +| FP         | Final presentation  | To do      |
 </WRAP> </WRAP>
 </table> </table>
Line 72: Line 92:
 <WRAP box 400px center> <WRAP box 400px center>
 ^ Sprint    ^ Task  ^  Duration (d) ^  Responsible ^ Involved   ^ ^ Sprint    ^ Task  ^  Duration (d) ^  Responsible ^ Involved   ^
-| 1             |             | X and Y      XYZ|   +| 1         TR     |             | A            CV,K ,A |   
-| 2             |             | Z            | XYZ|     +| 2         TC     |             | Z            | CV,K ,A |     
-| 3             |             | W, Y and Z   XYZ+| 3         SA     |             | K            CV,K ,A 
-| 4             |             |            XYZ+| 4         BB     |             |            CV,K ,A 
-| 5         B                 | Z and W      XYZ|   +| 5         SSS                | F            CV,K ,A |   
-| 6             |             | and      XYZ+| 6         LM     |             | C            | C, V, F ,K ,A | 
-        | C                 | and      XYZ|+| 7         | IR     | 7             | V            | C, V, F ,K ,A | 
 +| 8         | LLR    | 7             | F and      CV,K ,A 
 +        | RDP    | 7             | V and A      | C, V, F ,K ,A | 
 +| 10        | RIR    | 7             | C            | C, V, F ,K ,A | 
 +| 11        | SD     |             | K            | C, V, F ,K ,A | 
 +| 12        | FD     | 7             | V and      CV,K ,A | 
 +| 13        | FD     | 7             | C and A      | C, V, F ,K ,A | 
 +| 14        | FT     | 7             | F            | C, V, F ,K ,A | 
 +| 15        | FR     | 7             | K            | C, V, F ,K ,A | 
 +| 16        | FP     | 7             | F            | C, V, F ,K ,A |
 </WRAP> </WRAP>
 </table> </table>
Line 89: Line 118:
 <WRAP box 400px center> <WRAP box 400px center>
 ^ Sprint    ^ PBI   ^ Responsible  ^ Involved   ^ Status      ^ ^ Sprint    ^ PBI   ^ Responsible  ^ Involved   ^ Status      ^
-| 1             | X and Y      XYZ| Done        |  +| 1         TR     | A            CV,K ,A   Done               |  
-| 2             | Z            | XYZ| Done        |      +| 2         TC     | Z            | CV,K ,A   Done               |      
-| 3             | W, Y and Z   XYZDone        |  +| 3         SA     | K            CV,K ,A   In Progress        |  
-| 4             |            XYZDone        |  +| 4         BB     |            CV,K ,A   To-Do              |  
-| 5         B     Z and W      XYZIn progress |   +| 5         SSS    F            CV,K ,A   To-Do              |   
-| 6             | and      XYZIn progress +| 6         LM     | C            | C, V, F ,K ,A |   To-Do              | 
-        | C     and      XYZIn progress |+| 7         | IR     | V            | C, V, F ,K ,A |   To-Do              | 
 +| 8         | LLR    | F and      CV,K ,A   To-Do              
 +        | RDP    | V and A      | C, V, F ,K ,A |   To-Do              | 
 +| 10        | RIR    | C            | C, V, F ,K ,A |   To-Do              | 
 +| 11        | SD     | K            | C, V, F ,K ,A |   To-Do              | 
 +| 12        | FD     | V and      CV,K ,A   To-Do              | 
 +| 13        | FD     | C and A      | C, V, F ,K ,A |   To-Do              | 
 +| 14        | FT     | F            | C, V, F ,K ,A |   To-Do              | 
 +| 15        | FR     | K            | C, V, F ,K ,A |   To-Do              | 
 +| 16        | FP     | F            | C, V, F ,K ,A |   To-Do              |
 </WRAP> </WRAP>
 </table> </table>
Line 103: Line 141:
 <WRAP centeralign> <WRAP centeralign>
 <figure flabel1> <figure flabel1>
-{{:gantt_chart.gif|}}+{{ :gantt.png?nolink&800 |}}
 <caption>Release Gantt chart</caption> <caption>Release Gantt chart</caption>
 </figure> </figure>
QR Code